PROJECT LOCATION
Clay County
PROJECT DESCRIPTION
Resurface existing pavement of SR 21 from North CR 215 to South CR 218
TYPE/SCOPE OF SERVICES PROVIDED
This project consists of milling and resurfacing 1.8-mile of an existing four-lane divided rural roadway and an existing four lane suburban roadway. The design includes cross slope correction, addition of sidewalk, curb ramp reconstruction and guardrail improvements.
PROJECT HIGHLIGHTS
-
BAYER UNITED coordinated extensively with FDOT District 2 and FDOT Central Office to prepare and sign and seal District Two’s FIRST Smart Work Zone in the temporary traffic control plan!
