Ocala Airport North Development Road

OWNER

City of Ocala, FL (Sub to Infrastructure Consulting & Engineering, PLLC)

TYPE

Stand Alone Design Contract

LOCATION

Ocala, FL

STATUS

September 2023 – May 2024 (Design)
Construction began May 2024 (is it still ongoing?)

NOTEWORTHY

As a cost-savings measure, BUEC provided cross drain hydraulic connections between natural depressions.

PROJECT DESCRIPTION

The Ocala International Airport developed a new airplane hangar complex with an access road from 67th Ave to the north. This 2-lane road crosses a closed basin property and included 3 cross drains and two treatment ponds. BUEC conducted all hydraulic modeling and permitting coordination with SWFWMD.

121824 S1 S2 (10)

PROJECT PURPOSE

Bayer United provided drainage design, permitting coordination, and 3D modeling for the construction of the 3 ac North Development Road. As part of this project, Bayer United modeled the watershed modifications from this access road, provided a roadside swale and treatment pond for the new runoff, and designed cross drain connections for the existing natural depression areas. Additionally, BUEC assisted with utility coordination for potable water, electric, and sanitary sewer lines with a pump station.

13025 SD6 SD5 (6)
Pond Left (5)

PROJECT HIGHLIGHTS

As a cost-savings measure, BUEC provided cross drain hydraulic connections between natural depressions across the roadway using “bubbler” structures to provide pipe cover without raising the profile of the roadway. This design minimized the required embankment and protected the roadway from flooding.