Project 8 – SR 21 from N of CR 215 to S of CR 218 Roadway / ADA Design Clay County, FL

OWNER

FDOT District 2, Jacksonville, FL

TYPE

Stand-Alone Design

STATUS

March 2021 – March 2022 (Design Phase)
Construction Completed 2023
Construction Cost: $5,159,608

PROJECT PURPOSE

This project consists of milling and resurfacing 1.8-mile of an existing four-lane divided rural roadway and an existing four lane suburban roadway. The design includes cross slope correction, addition of sidewalk, curb ramp reconstruction and guardrail improvements.

BUEC coordinated extensively with FDOT District 2 and FDOT Central Office to prepare and sign and seal District 2’s FIRST Smart Work Zone in the temporary traffic control plan.

PROJECT HIGHLIGHTS

  • Project Management
  • Roadway Engineering
  • Drainage Engineering
  • Temporary Traffic Control
  • Utility Coordination
  • Geotechnical Services
  • Environmental Permits
  • Signing & Pavement Marking
  • Survey
  • Subsurface Utility Engineering
  • QA/QC
  • Post Design Services
Project 8 SR21 1